Performing Works On Technical Supervision During The Construction Of The Facility: "Reconstruction *** Kp" Kyivteploenergo ". Increasing The Installed Capacity Of The Tpp By Installing Cogeneration Installations With A Total Electrical Capacity *** With The Use Of A Gas Turbine Installation With A Boiler-Management And The Arrangement Of Physical Protection Of Cogeneration Plants And Auxiliary Equipment At: *** ». Arrangement Of Foundations And Protective Screens Of Structures Of Transformers, Gtu, Pke, Dcu.