Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - HC 546; HB 1004 Entire superstructure Area 50Sqmtr to be painted as per paint scheme including area above water line to be painted using Ms Akzonoble makes paint Wanda 2.. ,