The Purpose Of This Project Is The Renewal Of The Existing Meter Park So That The Apparent Losses Of The System Can Be Reduced And Increasing The Performance Of The Distribution Network. Tied With The Renovation Of The Meter Park, It Is Proposed To Digitize The Tel Rectura Meter Park, To Have A Better Control Of Registered Volumes And Facilitate The Tasks Of Reading And Control Of Flows. As Preliminary Work On The Renewal, It Is Planned To Improve 'Some Of The Arches Where They Will Be Installed, With Renewal Of Valves And The Placement Of' A Pressure Regulatory Valve In The Pipe Of The Power. Otherwise, We Also Want To Waterproof The Second Mosqueroles Deposit, As Well As Improve Its Access With The Formation Of 'Interior Scale Of Access, And The Improvement Of' Entrance And Exit Of The Same Deposit.